Ocla- Urban Redevelopment On Rural Land

Land Use
htl-issue-Ocla

What is the Project?

Impacts

Economic

does not comply with a commercial node requirement.

Economic

does not comply with the need requirement.

Environmental

declared uses include a dining establishment, but cannot be connected to WASD infrastructure outside the UDB.

Public Safety

remote area where MDFR response time does not comply with the national standard.

Agriculture

Would convert ~4 acres of farmland to a different use, however land is currently not utilized for agricultural purposes anyway.

HOLD THE LINE

Related Posts

836 Extension
Open

836 Extension- A Highway Through The Everglades?

More sprawl, more traffic, less Everglades - the 836 extension is a lose-lose for residents.

htl-issue-Limonar Development
Open

Limonar “Green City” UDB Expansion

Proposed "Special District" paves over farmland and pushes sprawl into the Everglades.

htl-issue-Limonar Development
Open

Limonar Development

Read more about this issue.

Hold the Line Coalition logo

Support "Hold the Line Coalition"

Sign The Pledge to defend our natural habitats and strengthen our communities!