EIP IV FL Round Hammock Land

Land Use
htl-issue-EIP IV FL Round Hammock Land

What is the Project?

Impacts

Agriculture

will result in removal of ~239ac from Ag utilization.

Agriculture/Environment

land is contaminated, remediation required.

Environmental

Given areas’ immediate proximity to parcels designated Environmental Protection - may be beneficial to establish a private mitigation bank in a more critical location, e.g. in an area more conducive to CERP/BBSEER goals and objectives where competition for critical land parcels is high (e.g. Pennsuco/North Trail Basin areas).

Environmental

Located within BBSEER implementation area.

HOLD THE LINE

Related Posts

836 Extension
Open

836 Extension- A Highway Through The Everglades?

More sprawl, more traffic, less Everglades - the 836 extension is a lose-lose for residents.

htl-issue-Limonar Development
Open

Limonar “Green City” UDB Expansion

Proposed "Special District" paves over farmland and pushes sprawl into the Everglades.

htl-issue-Ocla
Open

Ocla- Urban Redevelopment On Rural Land

Read more about this issue.

Hold the Line Coalition logo

Support "Hold the Line Coalition"

Sign The Pledge to defend our natural habitats and strengthen our communities!